![Workload Monitor](https://autodesk-exchange-apps-v-1-5-staging.s3.amazonaws.com/data/content/files/images/53MENN3P843G/APP6fd5ad2a268b457da1791e1bb830b47e/resized_fa2e295d-fe1b-43c5-97d7-9143c3040e5b_WLM.png?AWSAccessKeyId=AKIAWQAA5ADROJBNX5E4&Expires=1740180142&response-content-disposition=inline&response-content-type=image%2Fpng&Signature=c9M6oZuqVVsNyp%2BzVxMwLL6j33c%3D)
Workload Monitor
Placené
Operační systém:
Jazyk:
Popis
Workload Monitor is used to finding out effective work time and idle time of the resources[user].
- When an Autodesk® Revit® project is opened, our application detects the file name, user name and start time.
- Whenever Revit is idle, our application will trigger the timer to count the idle time.
- Final Effective time is.. Effective time = (End time - Start time)-Idle Time.
Informace o této verzi
Verze 4.0.0, 09.01.2020
Compatible for Autodesk® Revit® 2020.
when will updated product be available?
...will this be released?
Does WLM works in a Revit Project that utilizes RSN?
The add-in didn't work. If an update comes out fixing this, I will re-asses.
Thank you! i have any questions: - how can i set the tool start same time with revit? ( i have results with no idle-time, when the tool is not start first (why?)) - can i choose the Exportsetting? ( not "," i use ";" to different, the elements) -how i can reset it? or choose a start-Date for Export ( only one month f.ex.)
how about a 2016 release and can this be installed and managed without the users knowing
Ha ha! My thought's exactly Geoff!!!
Works well - although what is considered idle time? i.e. what criteria must be satisfied to be idle?
I use WLM to record my work time in different project. Now I'm waiting for the 2015 version
Great idea. Waiting for 2015 version updates soon.
great idea. I am testing now. Will update rating when I am done evaluating.